|
StuckPipePro
- Stuck pipe analysis
Stuck pipe occurrences are widely held to be the most expensive
drilling problem confronting the petroleum industry and the cost of
correcting, even a single occurrence, can amount to millions of
dollars.
StuckPipePro, developed by PVI
and Chevron, calculates differential sticking force, stuck chance along
drill strings or casings for pick up operation.
3D
wellbore
Multiple wellbore, pipe and
formation sections
Axial drag and side force
calculations
Differential sticking
Additional side force due to pipe
stiffness
Friction factors for different
wellbore intervals
Friction factors for each pipe
Extensive tubular database included
3D visualization of any
user-defined parameter
|