|
CEMPRO®
- Cement
job simulation
A
successful cement job is one of the most important factors to the
productive life of any well. Computer modeling has allowed far better
understanding of the cement job than that was previously possible.
CEMPRO was developed to aid in the design of optimum mud displacement.
Many potential problems can be identified prior to the job and
appropriate modifications can be made.
Flow
dynamics during cementing job for 3D wells
Offshore application. Fluid
returns to sea floor
Foamed cementing option
Forward or reverse circulation
Free-fall / back-fill (U-tubing)
calculation
ECDs / Pressures at various depths
vs. time
Annular contact time for all fluids
Turbulence table for fluids at
different geometry
Choke pressure can be manually
applied or computer calculated to
avoid u-tubing.
Handles up to 10 fluids, each
pumped at 5 rates.
Fluid displacement animation on
screen.
|